Documents

Information hub

On this page you can view and download a selection of materials that provide more information about our proposals for the Vyrnwy Frankton connection.

Landowner documents

  • Landowner payments Payment information for new electricity infrastructure
    Download
  • Environmental and engineering surveys Environmental and Engineering Surveys leaflet
    Download

Non-statutory consultation materials

  • Vyrnwy Frankton connection - Feedback Summary - Phase one consultation 2023 - Green GEN Cymru An summary of the Feedback received on the phase one consultation of the Vyrnwy Frankton connection
    Download
  • Vyrnwy Frankton connection - Consultation brochure (Single pages) - Phase one consultation 2023 - Green GEN Cymru An overview of our proposals for the Vyrnwy Frankton connection and how to take part in the consultation.
    Download
  • Vyrnwy Frankton connection - Consultation brochure (Spread pages) - Phase one consultation 2023 - Green GEN Cymru An overview of our proposals for the Vyrnwy Frankton connection and how to take part in the consultation.
    Download
  • Vyrnwy Frankton connection - Consultation postcard - Phase one consultation 2023 - Green GEN Cymru Postcard sent to all residential and business addresses in the consultation zone.
    Download
  • Vyrnwy Frankton connection - Consultation feedback form - Phase one consultation 2023 - Green GEN Cymru A copy of the feedback form that you can fill in to provide feedback on our proposals for the Vyrnwy Frankton connection.
    Download
  • Vyrnwy Frankton connection - Consultation event panels - Phase one consultation 2023 - Green GEN Cymru The event panels that we are using for our first consultation on the Vyrnwy Frankton connection.
    Download
  • Vyrnwy Frankton connection - Project FAQ - Phase one consultation 2023 - Green GEN Cymru A summary of some of the key questions and answers for the Vyrnwy Frankton connection.
    Download
  • Vyrnwy Frankton connection - Approach to Routeing Across England and Wales - Phase one consultation 2023 - Green GEN Cymru A report presenting the process for the identification and appraisal of route options.
    Download
  • Vyrnwy Frankton connection - Green GEN Phase 2 Grid Connection Strategy - Phase one consultation 2023 - Green GEN Cymru Grid connection options from Bute Energy’s proposed Mid Wales Energy Parks to the National Electricity Transmission System (NETS)
    Download
  • Vyrnwy Frankton connection - Vyrnwy Frankton Routeing and Consultation Document - Phase one consultation 2023 - Green GEN Cymru A report outlining the identification of route options and our approach to consultation.
    Download
  • Vyrnwy Frankton connection - Vyrnwy Frankton Routeing and Consultation Document - Figures 1 - Phase one consultation 2023 - Green GEN Cymru A report outlining the identification of route options and our approach to consultation.
    Download
  • Vyrnwy Frankton connection - Vyrnwy Frankton Routeing and Consultation Document - Figures 2 - Phase one consultation 2023 - Green GEN Cymru A report outlining the identification of route options and our approach to consultation.
    Download
  • Vyrnwy Frankton connection - Vyrnwy Frankton Routeing and Consultation Document - Figures 3 - Phase one consultation 2023 - Green GEN Cymru A report outlining the identification of route options and our approach to consultation.
    Download
  • Vyrnwy Frankton connection - EMF information leaflet - Phase one consultation 2023 - Green GEN Cymru Key information on EMF's and their relation to the project.
    Download

Project maps

Your smarter, renewable future starts today.

Want to keep up to date?

Please register your contact details with us if you would like to be kept informed about our project.

Register here